Solar PV Design • Installation • Consulting

Power your home with the sun and cut your bill to near zero.

NJGE Engineering Consultancy designs and installs hybrid solar PV systems with battery backup across Metro Manila — engineered for your roof, your load, and the Meralco grid.

BIR Registered DTI Accredited PEC 2017 Compliant
↓100%bill offset
potential
25 yrspanel
performance
Up to 100%
Electricity bill offset
₱8,000+
Typical monthly savings
25 yrs
Panel performance warranty
3–5 days
Typical installation time
What we do

End-to-end solar, handled by an engineer

From the first site assessment to net-metering approval, NJGE delivers the full solar journey — properly designed, properly documented, properly installed.

Solar PV System Design

Custom system sizing and engineering based on your roof area, energy profile, and budget — with a clear layout drawing and performance estimate.

Supply & Installation

Tier-1 monocrystalline panels, professional mounting, wiring, testing and commissioning — fully compliant with the Philippine Electrical Code (PEC 2017).

Hybrid Systems + Battery

LiFePO4 battery storage with automatic backup switchover — keep your lights, fans, Wi-Fi and fridge running during brownouts and at night.

Net Metering

We handle the Meralco net-metering interconnection so your excess daytime generation earns credits against your bill.

Financing & GSIS Loan Docs

Official supplier proposals and quotations prepared for GSIS GSEL and other solar loan applications — submission-ready documentation.

Maintenance & Monitoring

Wi-Fi monitoring of generation, consumption and battery health, plus on-site warranty support for the life of your system.

Why go solar

Spend on your own power plant — not on rising Meralco bills

Every peso you send to the utility is gone. With solar, that same money builds an asset that pays you back for decades.

  • Slash your monthly bill

    Offset up to 100% of daytime consumption and store the rest for night use.

  • Backup power during outages

    Hybrid + battery means essential loads stay on when the grid goes down.

  • Strong, predictable ROI

    Typical payback of around 6 years, then decades of near-free electricity.

  • Clean, quiet, low-maintenance

    25-year performance warranty on panels and a 10-year battery warranty.

A typical NJGE hybrid system

Grid electricitySolar + battery

Up to ~82% of a household's energy needs covered by the sun and battery storage — the rest topped up from the grid.

Est. monthly savings₱8,000
Simple payback~6.2 years

Based on a 7.2 kWp + 5.12 kWh reference design. Actual figures depend on your consumption, roof and site.

How it works

From first call to clean power in four steps

Free Site Assessment

We review your bills, visit the site, and check your roof, load, and grid connection.

Custom Design & Quote

You get an engineered system design, layout drawing, savings estimate and clear quotation.

Installation & Commissioning

Professional install in 3–5 working days, then full testing and commissioning.

Net Metering & Monitoring

We process Meralco net metering and set up app monitoring of your new system.

Reference design

Example system we engineered

A real 7.2 kWp hybrid solar + battery design for a 2-storey home on the Meralco grid — the kind of system we tailor to every client.

Hybrid • Grid-Tied + Battery

7.2 kWp Hybrid Solar System

16 × 450W Tier-1 panels with 5.12 kWh LiFePO4 storage and an 8 kW hybrid inverter.

~797
kWh / month generated
₱8,000
est. monthly savings
Solar Panels
16 × 450W Mono PERC, Tier 1
Inverter
8 kW Hybrid 2 MPPT, <10ms backup
Battery
5.12 kWh LiFePO4, 10-yr warranty
Backup
3–5 hrs essential loads
Net Metering
Meralco grid-tied
Simple Payback
~6.2 years

Tier-1 brands such as JA Solar, Jinko, LONGi & Canadian Solar (panels); Deye, Growatt & GoodWe (inverters); Pylontech, Deye & Felicity (batteries). Final selection depends on availability.

About NJGE

Engineering-led solar you can trust

NJGE Engineering Consultancy is a Philippine solar provider specialising in the design, installation, testing and commissioning of grid-tied and hybrid solar PV systems with battery storage.

Every project is engineered to the Philippine Electrical Code (PEC 2017), DOE regulations and local building codes — and documented to a standard suitable for GSIS GSEL and other solar loan applications. We serve homeowners and small businesses across Metro Manila and nearby areas.

NJGE Engineering

Engr. Normina Jane G. Emia

Proprietor / Project Engineer

Leads every NJGE project from assessment and design through to installation and net-metering — so you deal directly with the engineer responsible for your system.

BIR Registered DTI Accredited PEC 2017 Compliant DOE-aligned
Get started

Request your free solar quote

Tell us a little about your property and your latest electricity bill. We'll get back to you with next steps and a tailored estimate.

We'll only use your details to respond to your enquiry.

Service area
Metro Manila & nearby provinces
Response time
Within 1–2 business days
Business
NJGE Engineering Consultancy
TIN 500-038-007-000
Ready to start? Send your latest Meralco bill with your message for a faster, more accurate estimate.